380kV OHTL from Jillah BSP #9063 to Layla BSP #9049 — Access Roads & Structure Pads
- Customer
- National Contracting Company Ltd. (Transmission & Distribution Division)
- Location
- KSA
Overview
Civil support works for the 380kV overhead transmission line corridor linking Jillah Bulk Supply Point (BSP #9063) and Layla Bulk Supply Point (BSP #9049). The package focuses on building safe, all-weather site access and durable structure pads that enable tower foundation and stringing activities under National Contracting Company Ltd. (Transmission & Distribution) supervision.
Scope of work
- 01
Construction of access roads and finger roads along the OHTL alignment, including scarification, cut-and-fill earthworks, and embankment formation to design levels.
- 02
Road layer works with approved fill / Sub-base A-1A material, multi-lift compaction to 95% MDD, watering, grading, and final surface profiling for construction traffic.
- 03
Structure pad construction at tower locations in normal soil, including site preparation, subgrade compaction, sub-base placement, and finished surface course layers ready for foundation crews.
- 04
Drainage-aware grading and edge finishing so pads and roads remain trafficable during construction, with spoil management and site housekeeping.
- 05
Survey control, material acceptance, density testing, and joint progressive inspection with the client and SEC-aligned quality requirements.
- 06
Equipment-supported execution (graders, rollers, water trucks, and material handling plant) with certified operators and continuous HSE controls along the corridor.
Works follow approved route and civil drawings, NCC / SEC project specifications, QA/QC hold points, and HSE rules for transmission line construction across the Jillah–Layla corridor.